Description
This service is for the new owner of a house that is being built.
We offer a bundle of four reports:
- 5 construction stage inspections
- Pre-pour
- Framing
- Lock-up (roof, cladding, external doors and windows)
- Fixings (services, linings, doors)
- Completion (kitchen, cabinets, painting, fixtures, outlets)
- Dilapidation Report
- Pre-Handover Report
- Warranty Inspection
Construction stage inspections
Inspections undertaken at various stages of your build. If you want reassurance and independent expert advice while your home is being constructed to an acceptable standard, then you would require staged construction inspections.
Dilapidation report
Prior to commencement of construction, a dilapidation report involves an inspection of your property (if there are buildings not being affected) and the surrounding assets, like fences, gates, poles, footpaths). The report is a record of the current condition of the property and surrounds which is intended to detail any existing cracks, issues or wear and tear present before the nearby construction commences.
Pre-Handover Inspection report
You the client, would be invited by the builder to inspect the renovation and identify outstanding issues and defects. A handover inspection report provides you with an independent and unbiased final house inspection report, describing the end condition and finishes of the completed construction work at Practical Completion.
Together with the dilapidation report and the pre-handover report, issues due to the renovation works could be easily identified. This mitigates any disputes that would arise and provides you peace of mind should disputes progress to formal action.
Warranty inspection
New homes built in NSW have warranty periods assigned to structural and non-structural elements of the building. The inspection performed is to identify defects so you can have the building contractor rectify the defective building work if:
- within 6 years and 3 months of the building work being completed for structural works;
- within 12 months of the building work being completed for non-structural works.